SCADA for 25 kV AC electrification, Elite seriesSample
by Dhruvline Traction Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Dhruvline Traction Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
SCADA for 25 kV AC electrification from Dhruvline, Elite series: 3 control posts options between Up to 10 posts and Up to 50 posts. Design: energy and tariff reports, integration with OHE maintenance and remote operation of interrupters and isolators. Typically used for mining railways, freight corridors and railway zones. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Dhruvline
- Model
- DHR-C59 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 10 lot
- Lead time
- 12-16 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsDHR-C59-01 | Control posts: Up to 10 posts | 10 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 25 postsDHR-C59-02 | Control posts: Up to 25 posts | 10 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 50 postsDHR-C59-03 | Control posts: Up to 50 posts | 10 lot · 12-16 weeks | for verified buyers |
Specifications
| Control posts | Up to 10 posts to Up to 50 posts (see variants) |
|---|---|
| Architecture | Redundant server |
| RTU I/O | Per post |
| Communication | GSM backupmade to order: OFC / MPLS |
| Protocol | IEC 60870-5-104made to order: IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |