Catalogue / Industrial heat pumps
Water-to-water process heat pump, Plus 8 seriesSample
by Dhruvmax Thermal Electrification (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Dhruvmax Thermal Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus 8 range of water-to-water process heat pump by Dhruvmax covers 5 heating capacity options (50 kW to 2.5 MW). Highlights: waste heat recovery from chillers, variable speed compressor and cascade configuration for higher lift. Suited to chemical processes, textile dyeing and dairies. Designed and tested to IS 8148, ISO 13256-1 and EN 14511. Lead time 12-16 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Dhruvmax
- Model
- DHR-3B1 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 12-16 weeks
- Warranty
- 24 months
- Standards
- IS 8148, ISO 13256-1, EN 14511
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Heating capacity50 kWDHR-3B1-01 | Heating capacity: 50 kW | 1 nos · 12-16 weeks | for verified buyers |
| Heating capacity150 kWDHR-3B1-02 | Heating capacity: 150 kW | 1 nos · 12-16 weeks | for verified buyers |
| Heating capacity500 kWDHR-3B1-03 | Heating capacity: 500 kW | 1 nos · 12-16 weeks | for verified buyers |
| Heating capacity1 MWDHR-3B1-04 | Heating capacity: 1 MW | 1 nos · 20-26 weeks | for verified buyers |
| Heating capacity2.5 MWDHR-3B1-05 | Heating capacity: 2.5 MW | 1 nos · 20-26 weeks | for verified buyers |
Specifications
| Heating capacity | 50 kW to 2.5 MW (see variants) |
|---|---|
| Refrigerant | R245fa |
| Heat source | Process coolingmade to order: Waste water / Ambient air / Ground |
| Source temperature | 20-40 deg C |
| Sink temperature | Up to 90 deg C |
| COP | 3.5made to order: 2.5 / 4.5 |
| Compressor | Screwmade to order: Piston / Turbo |
| Supply | 6.6 kV |
| Control | PLC with BMS link |
| Heat exchangers | Plate SS 316 |
| Noise | < 75 dB(A) |
| Footprint | Skid-mounted |