Catalogue / Solar plant O&M & module cleaning

No photo yet

Solar plant O&M with performance monitoring, Neo 8 seriesSample

by Doaba Engineering Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Doaba Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Neo 8 service of solar plant O&M with performance monitoring by Doaba covers 3 plant capacity options (50 MWp to 250 MWp). Design: daily generation and loss analysis, thermography twice a year and IV curve scanning of strings. Suited to lender-monitored assets, c&I rooftop owners and group captive plants. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Takeover in 2-3 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Doaba
Model
DOA-261 series
Listing type
Service
Unit
MWp
Minimum order
1 MWp
Lead time
Takeover in 2-3 weeks
Warranty
Availability guarantee with penalty
Standards
IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
Delivers to
West India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity50 MWpDOA-261-01Plant capacity: 50 MWp1 MWp · Takeover in 2-3 weekson quote
Plant capacity100 MWpDOA-261-02Plant capacity: 100 MWp1 MWp · Takeover in 2-3 weekson quote
Plant capacity250 MWpDOA-261-03Plant capacity: 250 MWp1 MWp · Takeover in 2-3 weekson quote

Specifications

Plant capacity50 MWp to 250 MWp (see variants)
ScopeFull O&M with spare management
Cleaning methodWaterless dry brushmade to order: Semi-automatic wet / Robotic
Cleaning frequencyWeekly
Availability guaranteePlant availability 99%
Manpower1 engineer plus 4 technicians per 10 MW
SparesClient suppliesmade to order: Consumables included
MonitoringWeekly PR and PLF report
Response time4 hours for critical faults
ReportingMonthly generation reportmade to order: Dashboard access for lenders
Contract term1 year

BARREL: Bharat Atom Renewable Resources Energy Limited