Catalogue / Transformer & scrap disposal

No photo yet

Oil and hazardous waste disposal, Edge seriesSample

by Doabakiran Capital Advisors (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Doabakiran Capital Advisors (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Edge service of oil and hazardous waste disposal by Doabakiran covers 4 scrap quantity options (5 tonnes to 100 tonnes). Key features: transparent weighment, copper and aluminium valuation and environmental compliance. Suited to EPC contractors, utilities and DISCOMs and substation upgrades. Delivered in line with Hazardous and Other Wastes Rules 2016, Environment Protection Act 1986 and Central Pollution Control Board Guidelines. Mobilisation Pick-up in 5-10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Doabakiran
Model
DOA-BB1 series
Listing type
Service
Unit
lot
Minimum order
1 lot
Lead time
Pick-up in 5-10 days
Warranty
Certificate of disposal
Standards
Hazardous and Other Wastes Rules 2016, Environment Protection Act 1986, Central Pollution Control Board Guidelines
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Scrap quantity5 tonnesDOA-BB1-01Scrap quantity: 5 tonnes1 lot · Pick-up in 5-10 dayson quote
Scrap quantity10 tonnesDOA-BB1-02Scrap quantity: 10 tonnes1 lot · Pick-up in 5-10 dayson quote
Scrap quantity50 tonnesDOA-BB1-03Scrap quantity: 50 tonnes1 lot · Processing 1-4 weekson quote
Scrap quantity100 tonnesDOA-BB1-04Scrap quantity: 100 tonnes1 lot · Processing 1-4 weekson quote

Specifications

Scrap quantity5 tonnes to 100 tonnes (see variants)
Scrap typeOilmade to order: Transformers / Cables / Switchgear
ProcessOil draining and treatment
AuthorisationPCB-authorised recycler
PCB testingOil tested for PCBmade to order: Not applicable
CollectionPick-up with crane
DocumentationWeighment slips, form 10made to order: Disposal certificate
ValuationFixed pricemade to order: Market linked
PaymentWithin 7 days
SafetyPPE crewmade to order: Spill containment
Timeline3-4 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited