Catalogue / Civil & foundation works

No photo yet

Pre-cast and cast-in-situ foundations for transformers, Ultra 9 seriesSample

by Doaba Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Doaba Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Doaba Ultra 9 pre-cast and cast-in-situ foundations for transformers, offered in 3 works volume options from 25 MW equivalent to 100 MW equivalent. Design: local labour employed where possible, monsoon-ready drainage planning and pile layout tolerance maintained to design. Used by industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Doaba
Model
DOA-477 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume25 MW equivalentDOA-477-01Works volume: 25 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume50 MW equivalentDOA-477-02Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume100 MW equivalentDOA-477-03Works volume: 100 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume25 MW equivalent to 100 MW equivalent (see variants)
Foundation typeDriven steel pilemade to order: Ramming or screw pile / RCC bored pile / Raft or isolated footing
Concrete gradeM30
Pull-out testing2% piles testedmade to order: Random test plus lateral load
ReinforcementFe 500D TMT
Roads and drainageWBM road with culvertsmade to order: Murram road, 4 m wide / Not included
BoundaryChain link fence 2.4 mmade to order: Compound wall with barbed wire
QualityNABL lab testing of materialsmade to order: Cube test reports per pour
MachineryBatching plant at site
Duration4-8 weeksmade to order: 3-6 months
Payment termsMeasured running bills

BARREL: Bharat Atom Renewable Resources Energy Limited