Catalogue / Cabling, trenching & HDD works
Cable trenching and laying for power and control cables, Pro 9 seriesSample
by Doaba Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Doaba Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Pro 9 service of cable trenching and laying for power and control cables by Doaba covers 6 cable route length options (1 km to 50 km). Highlights: utility locating before excavation, HDD bore log and as-built survey and warning tape and marker installation. Used by urban distribution upgrades, renewable plant internal networks and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Doaba
- Model
- DOA-B54 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmDOA-B54-01 | Cable route length: 1 km | 1 km · Permits may extend timeline | on quote |
| Cable route length2 kmDOA-B54-02 | Cable route length: 2 km | 1 km · Permits may extend timeline | on quote |
| Cable route length5 kmDOA-B54-03 | Cable route length: 5 km | 1 km · Permits may extend timeline | on quote |
| Cable route length10 kmDOA-B54-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | on quote |
| Cable route length20 kmDOA-B54-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmDOA-B54-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 0.9 mmade to order: 1.2 m / 1.5 m |
| Cable type | 11/33 kV XLPE |
| Jointing | Premoulded |
| Restoration | Road and footpath restoration |
| Permissions | Contractor arranges road cut approvalsmade to order: Client arranges |
| Testing | Insulation and VLF test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |