Catalogue / Installation & erection
Cable laying, termination and earthing installation, Ultra seriesSample
by Doaba Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Doaba Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Cable laying, termination and earthing installation from Doaba, Ultra series: 6 installation scope options between 1 MW and 100 MW. Design: torque-verified structure and module fixing, material reconciliation reports and mobile team available for remote sites. Suited to wind farm substations, hybrid projects and c&I rooftop and ground mount. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Start after material at site; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Doaba
- Model
- DOA-DD1 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Start after material at site
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWDOA-DD1-01 | Installation scope: 1 MW | 1 MW · Start after material at site | on quote |
| Installation scope5 MWDOA-DD1-02 | Installation scope: 5 MW | 1 MW · Start after material at site | on quote |
| Installation scope10 MWDOA-DD1-03 | Installation scope: 10 MW | 1 MW · Start after material at site | on quote |
| Installation scope25 MWDOA-DD1-04 | Installation scope: 25 MW | 1 MW · Start after material at site | on quote |
| Installation scope50 MWDOA-DD1-05 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
| Installation scope100 MWDOA-DD1-06 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Structure and module installation |
| Manpower deployed | 60 technicians plus supervisorsmade to order: 25 technicians per MW-block / Peak crew of 200 |
| Supervision | Site engineer and safety officermade to order: Project manager, engineers, QA/QC |
| Equipment | Own cranes and erection toolsmade to order: Pile driver, crane, telehandler |
| Quality plan | Client-approved ITP |
| Safety | Lost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits |
| Licence | Class A contractor registrationmade to order: Electrical contractor licence |
| Insurance | CAR and workmen compensation |
| Reporting | Daily progress reportmade to order: Weekly report with look-ahead plan |
| Payment terms | Milestone based with 10% retentionmade to order: Monthly running bills |