Catalogue / Transmission line erection & stringing
220 kV and 400 kV tower foundation and erection, Max seriesSample
by Doaba Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Doaba Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
220 kV and 400 kV tower foundation and erection from Doaba, Max series: 3 voltage level options between 66 kV and 220 kV. Highlights: tension check and final clearance survey, tower verticality and bolt tightening records and anti-theft bolt fixing. Used by industrial supply lines, solar and wind evacuation lines and railway traction feed. Delivered in line with IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles) and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 15 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Doaba
- Model
- DOA-B79 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 15 days
- Warranty
- Workmanship 12 months
- Standards
- IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles), CEA (Measures relating to Safety) Regulations
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level66 kVDOA-B79-01 | Voltage level: 66 kV | 1 km · Mobilisation in 15 days | on quote |
| Voltage level132 kVDOA-B79-02 | Voltage level: 132 kV | 1 km · Mobilisation in 15 days | on quote |
| Voltage level220 kVDOA-B79-03 | Voltage level: 220 kV | 1 km · Mobilisation in 15 days | on quote |
Specifications
| Voltage level | 66 kV to 220 kV (see variants) |
|---|---|
| Circuit type | Double circuit |
| Conductor | AAAC or HTLS |
| Scope | Foundation, erection and stringingmade to order: Erection and stringing only |
| Stringing method | Conventional stringingmade to order: Tension stringing |
| Crew | Gang of 25 per sectionmade to order: Two erection gangs plus foundation team |
| Tower testing | Prototype test witnessedmade to order: Type-tested towers |
| Productivity | 3 km per week |
| Approvals support | Forest and crossing permissionmade to order: PTCC clearance and RoW |
| Safety | Fall protection and line clearancemade to order: Live-line crossing precautions |
| Insurance | CAR and workmen compensationmade to order: Third-party liability |