Catalogue / Substation automation (IEC 61850)

No photo yet

Digital substation process bus, Titan seriesSample

by Dwaraka Power Controls (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Dwaraka Power Controls (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Titan range of digital substation process bus by Dwaraka covers 4 bays options (Up to 16 bays to Up to 128 bays). Highlights: single-line diagram with live status, interoperable multi-vendor bay devices and sequence of events recorder. Suited to discom 33/11 kV substations, solar pooling stations and metro traction. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 16-24 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Dwaraka
Model
DWA-982 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
16-24 weeks
Warranty
24 months
Standards
IEC 61850, IEC 62351, IEC 60870-5-104
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Steel skid with shrink wrap
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
BaysUp to 16 baysDWA-982-01Bays: Up to 16 bays1 lot · 16-24 weeksfor verified buyers
BaysUp to 32 baysDWA-982-02Bays: Up to 32 bays1 lot · 16-24 weeksfor verified buyers
BaysUp to 64 baysDWA-982-03Bays: Up to 64 bays1 lot · 16-24 weeksfor verified buyers
BaysUp to 128 baysDWA-982-04Bays: Up to 128 bays1 lot · 16-24 weeksfor verified buyers

Specifications

BaysUp to 16 bays to Up to 128 bays (see variants)
ArchitectureStation busmade to order: Station + process bus
ProtocolIEC 60870-5-104made to order: IEC 61850 Ed 2 / DNP3
Network topologyDual starmade to order: HSR ring / PRP
HMIRedundant servers
Time syncGPS with PTP
GatewayRedundant to RLDC / SLDC
Cyber-securityFirewall, IEC 62351, NERC style
HistorianIncluded, 5 years data
Engineering toolConfiguration software
Network switchesIndustrial managed
Auxiliary supply220 V DC
TestingFAT + SAT

BARREL: Bharat Atom Renewable Resources Energy Limited