Catalogue / Third-party inspection (TPI)
Civil and structural stage inspection, Volt 2 seriesSample
by Dwaraka Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Dwaraka Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Dwaraka Volt 2 civil and structural stage inspection, offered in 3 inspection effort options from 10 man-days to 50 man-days. Key features: non-conformity reports with closure tracking, photographic evidence of each inspection and quick mobilisation across India. Typically used for EPC contractors and developers, utilities and PSUs and lender quality assurance. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Dwaraka
- Model
- DWA-963 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort10 man-daysDWA-963-01 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort20 man-daysDWA-963-02 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort50 man-daysDWA-963-03 | Inspection effort: 50 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
Specifications
| Inspection effort | 10 man-days to 50 man-days (see variants) |
|---|---|
| Equipment inspected | PV modules and invertersmade to order: Transformers and reactors / Switchgear and relays / Cables and conductors |
| Inspection stage | Raw materialmade to order: In-process / Final pre-dispatch |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | B.E. Electrical with 8 years experiencemade to order: Level II NDT certified |
| Accreditation | Empanelled inspection agency |
| Report | Inspection release note |
| Coverage | Pan Indiamade to order: Domestic and export vendors |
| Sampling | AQL level II |
| Release note | Hard copy plus scanmade to order: Digital signature |
| Travel | At actuals |