Catalogue / Electrical safety audits

No photo yet

Safety audit for solar plants and substations, Edge seriesSample

by Dwaraka Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Dwaraka Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Safety audit for solar plants and substations from Dwaraka, Edge series: 5 installed load options between 1 MVA and 50 MVA. Design: risk-ranked findings, earthing health and soil resistivity and compliance matrix against CEA safety rules. Used by data centres, manufacturing plants and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Dwaraka
Model
DWA-882 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 7-14 days
Warranty
Re-audit at reduced rate
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load1 MVADWA-882-01Installed load: 1 MVA1 site · Report in 7-14 dayson quote
Installed load5 MVADWA-882-02Installed load: 5 MVA1 site · Report in 7-14 dayson quote
Installed load10 MVADWA-882-03Installed load: 10 MVA1 site · Report in 7-14 dayson quote
Installed load25 MVADWA-882-04Installed load: 25 MVA1 site · Report in 7-14 dayson quote
Installed load50 MVADWA-882-05Installed load: 50 MVA1 site · Report in 7-14 dayson quote

Specifications

Installed load1 MVA to 50 MVA (see variants)
ScopeVisual and documentation audit
AuditorCEA-licensed engineer
MeasurementsThermography and power quality
ReportAction plan with timeline
Statutory recordsRegisters, test certificates, licencemade to order: Permit-to-work audit
SamplingRepresentative LV panelsmade to order: 100% of HV equipment
Follow-upRe-audit after 3 monthsmade to order: Close-out verification
Turnaround1-2 weeks
PresentationReport only
AccreditationISO/IEC 17020 body

BARREL: Bharat Atom Renewable Resources Energy Limited