Catalogue / Third-party inspection (TPI)
Civil and structural stage inspection, Pro 2 seriesSample
by Dwaraka Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Dwaraka Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Civil and structural stage inspection from Dwaraka, Pro 2 series: 3 inspection effort options between 20 man-days and 100 man-days. Key features: hold and witness points per QAP, quick mobilisation across India and calibration check of test equipment. Suited to utilities and PSUs, government procurement and EPC contractors and developers. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Dwaraka
- Model
- DWA-964 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort20 man-daysDWA-964-01 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort50 man-daysDWA-964-02 | Inspection effort: 50 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort100 man-daysDWA-964-03 | Inspection effort: 100 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
Specifications
| Inspection effort | 20 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | PV modules and inverters |
| Inspection stage | Raw materialmade to order: In-process / Final pre-dispatch |
| Standards used | Per client specificationmade to order: Per approved QAP |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | Empanelled inspection agencymade to order: ISO/IEC 17020 body |
| Report | Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendorsmade to order: Pan India |
| Sampling | As per IS 2500made to order: AQL level II |
| Release note | Digital signaturemade to order: Hard copy plus scan |
| Travel | At actuals |