Catalogue / Factory acceptance test (FAT) witnessing
FAT witnessing for power transformers, Plus seriesSample
by Dwaraka Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Dwaraka Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Plus service of FAT witnessing for power transformers by Dwaraka covers 3 equipment value options (INR 1 crore to INR 10 crore). Highlights: independent and impartial witness, defect and observation log and test curves and data captured. Used by EPC and OEM contracts, lender acceptance and BESS projects. Delivered in line with IEC 60076, IEC 62271 and IEC 62109. Mobilisation Deployment within 3-5 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Dwaraka
- Model
- DWA-D81 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Deployment within 3-5 days
- Warranty
- As per contract
- Standards
- IEC 60076, IEC 62271, IEC 62109
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Equipment valueINR 1 croreDWA-D81-01 | Equipment value: INR 1 crore | 1 day · Deployment within 3-5 days | on quote |
| Equipment valueINR 5 croreDWA-D81-02 | Equipment value: INR 5 crore | 1 day · Deployment within 3-5 days | on quote |
| Equipment valueINR 10 croreDWA-D81-03 | Equipment value: INR 10 crore | 1 day · Deployment within 3-5 days | on quote |
Specifications
| Equipment value | INR 1 crore to INR 10 crore (see variants) |
|---|---|
| Test plan | Based on tender specification |
| Tests witnessed | Routine plus special tests |
| Team | Specialist engineers per discipline |
| Location | Domestic factorymade to order: International factory |
| Documentation review | Drawing, QAP and test certificate reviewmade to order: Full documentation check |
| Deliverable | Report with punch listmade to order: FAT report with release note |
| Remote witness | Video witness available |
| Turnaround | 3-5 days |
| Hold points | Customer defined |
| Travel | Extra at actuals |