Catalogue / Static transfer switches
Rack-mount STS for dual-feed loads, Volt 2 seriesSample
by Ellora Data Centre Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ellora Data Centre Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Volt 2 range of rack-mount STS for dual-feed loads by Ellora covers 3 rating options (16 A to 63 A). Highlights: preferred source selection with auto retransfer, maintenance bypass for hot service and phase-angle synchronism check before transfer. Used by dual UPS bus architecture, single-corded server loads in data centres and hospital critical loads. Designed and tested to IEC 62310-3, IEC 62310-1 and IEC 62310-2. Lead time 6-8 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ellora
- Model
- ELL-843 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 6-8 weeks
- Warranty
- 24 months from supply
- Standards
- IEC 62310-3, IEC 62310-1, IEC 62310-2
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating16 AELL-843-01 | Rating: 16 A | 2 nos · 6-8 weeks | for verified buyers |
| Rating32 AELL-843-02 | Rating: 32 A | 2 nos · 6-8 weeks | for verified buyers |
| Rating63 AELL-843-03 | Rating: 63 A | 2 nos · 6-8 weeks | for verified buyers |
Specifications
| Rating | 16 A to 63 A (see variants) |
|---|---|
| Phase | 1-phase |
| Rated voltage | 400 V ACmade to order: 230 V AC / 415 V AC |
| Transfer time | Below 6 ms |
| Transfer type | Break-before-make |
| Switching device | SCR thyristors |
| Source priority | Preferred source selectable |
| Maintenance bypass | Manual make-before-break |
| Overload | 150% 1 minmade to order: 125% 10 min |
| Efficiency | Above 99% |
| Display | LCD |
| Communication | Dry contacts |
| Mounting | Floor standingmade to order: 1U/2U rack |