Catalogue / Testing & commissioning

No photo yet

SCADA integration and communication testing, Plus seriesSample

by Ellorakavach Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Plus service of SCADA integration and communication testing by Ellorakavach covers 3 plant capacity options (25 MW to 100 MW). Design: live relay setting verification, handover training to O&M team and test formats agreed before mobilisation. Used by EPC handover to owners, lender completion tests and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ellorakavach
Model
ELL-EE5 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Mobilisation in 5 days
Warranty
Retest at no cost if failure traced to test error
Standards
IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity25 MWELL-EE5-01Plant capacity: 25 MW1 MW · Mobilisation in 5 dayson quote
Plant capacity50 MWELL-EE5-02Plant capacity: 50 MW1 MW · Mobilisation in 5 dayson quote
Plant capacity100 MWELL-EE5-03Plant capacity: 100 MW1 MW · Mobilisation in 5 dayson quote

Specifications

Plant capacity25 MW to 100 MW (see variants)
Tests coveredFull plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests
InstrumentsCalibrated IV tracer, megger, CRM
CalibrationNABL traceable certificatesmade to order: Calibration valid at test date
TeamCommissioning engineer plus 2 testersmade to order: Lead plus 5 member crew
Statutory supportCEIG inspection coordinationmade to order: DISCOM charging support
ReportsCommissioning dossier with as-built
Duration on site3-4 weeksmade to order: 5-7 days / 10-14 days
Performance guarantee testCapacity and PR test per contractmade to order: 72-hour trial run
Grid code checksReactive power and ramp ratemade to order: Not included
Payment50% on start, 50% on reportmade to order: Milestone on energisation

BARREL: Bharat Atom Renewable Resources Energy Limited