Catalogue / Testing & commissioning
SCADA integration and communication testing, Plus seriesSample
by Ellorakavach Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Plus service of SCADA integration and communication testing by Ellorakavach covers 3 plant capacity options (25 MW to 100 MW). Design: live relay setting verification, handover training to O&M team and test formats agreed before mobilisation. Used by EPC handover to owners, lender completion tests and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ellorakavach
- Model
- ELL-EE5 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 5 days
- Warranty
- Retest at no cost if failure traced to test error
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity25 MWELL-EE5-01 | Plant capacity: 25 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity50 MWELL-EE5-02 | Plant capacity: 50 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity100 MWELL-EE5-03 | Plant capacity: 100 MW | 1 MW · Mobilisation in 5 days | on quote |
Specifications
| Plant capacity | 25 MW to 100 MW (see variants) |
|---|---|
| Tests covered | Full plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests |
| Instruments | Calibrated IV tracer, megger, CRM |
| Calibration | NABL traceable certificatesmade to order: Calibration valid at test date |
| Team | Commissioning engineer plus 2 testersmade to order: Lead plus 5 member crew |
| Statutory support | CEIG inspection coordinationmade to order: DISCOM charging support |
| Reports | Commissioning dossier with as-built |
| Duration on site | 3-4 weeksmade to order: 5-7 days / 10-14 days |
| Performance guarantee test | Capacity and PR test per contractmade to order: 72-hour trial run |
| Grid code checks | Reactive power and ramp ratemade to order: Not included |
| Payment | 50% on start, 50% on reportmade to order: Milestone on energisation |