Catalogue / Installation & erection
Power transformer installation and oil filling, Xtra 5 seriesSample
by Ellorakavach Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Xtra 5 service of power transformer installation and oil filling by Ellorakavach covers 5 installation scope options (10 MW to 200 MW). Design: torque-verified structure and module fixing, cable route marking and tray fixing and material reconciliation reports. Typically used for c&I rooftop and ground mount, wind farm substations and utility solar parks. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ellorakavach
- Model
- ELL-717 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 10 days
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope10 MWELL-717-01 | Installation scope: 10 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope25 MWELL-717-02 | Installation scope: 25 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope50 MWELL-717-03 | Installation scope: 50 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope100 MWELL-717-04 | Installation scope: 100 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope200 MWELL-717-05 | Installation scope: 200 MW | 1 MW · Phased by block | for verified buyers |
Specifications
| Installation scope | 10 MW to 200 MW (see variants) |
|---|---|
| Scope | Electrical BoP erectionmade to order: Structure and module installation / Complete mechanical and electrical erection |
| Manpower deployed | 25 technicians per MW-block |
| Supervision | Site engineer and safety officer |
| Equipment | Pile driver, crane, telehandler |
| Quality plan | Client-approved ITP |
| Safety | Daily toolbox talks, PPE, permitsmade to order: Lost-time-injury-free target, HIRA |
| Licence | Electrical contractor licencemade to order: Class A contractor registration |
| Insurance | CAR, WC and third-party liabilitymade to order: CAR and workmen compensation |
| Reporting | Weekly report with look-ahead plan |
| Payment terms | Monthly running billsmade to order: Milestone based with 10% retention |