Catalogue / Civil & foundation works
Site roads, drainage and boundary wall, Duo seriesSample
by Ellorakavach Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Ellorakavach Duo site roads, drainage and boundary wall, offered in 3 works volume options from 5 MW equivalent to 25 MW equivalent. Highlights: waterproofing for cable trenches, daily quantity and progress log and local labour employed where possible. Used by solar parks, industrial plants and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ellorakavach
- Model
- ELL-5E5 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume5 MW equivalentELL-5E5-01 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume10 MW equivalentELL-5E5-02 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentELL-5E5-03 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
Specifications
| Works volume | 5 MW equivalent to 25 MW equivalent (see variants) |
|---|---|
| Foundation type | Raft or isolated footing |
| Concrete grade | M25made to order: M30 / M40 for turbine foundation |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | WBM road with culvertsmade to order: Murram road, 4 m wide / Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | NABL lab testing of materialsmade to order: Cube test reports per pour |
| Machinery | Batching plant at site |
| Duration | 4-8 weeksmade to order: 3-6 months |
| Payment terms | Item rate with retentionmade to order: Measured running bills |