Catalogue / Civil & foundation works

No photo yet

Site roads, drainage and boundary wall, Duo seriesSample

by Ellorakavach Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Ellorakavach Duo site roads, drainage and boundary wall, offered in 3 works volume options from 5 MW equivalent to 25 MW equivalent. Highlights: waterproofing for cable trenches, daily quantity and progress log and local labour employed where possible. Used by solar parks, industrial plants and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ellorakavach
Model
ELL-5E5 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume5 MW equivalentELL-5E5-01Works volume: 5 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume10 MW equivalentELL-5E5-02Works volume: 10 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume25 MW equivalentELL-5E5-03Works volume: 25 MW equivalent1 job · Mobilisation in 10 dayson quote

Specifications

Works volume5 MW equivalent to 25 MW equivalent (see variants)
Foundation typeRaft or isolated footing
Concrete gradeM25made to order: M30 / M40 for turbine foundation
Pull-out testingRandom test plus lateral loadmade to order: 2% piles tested
ReinforcementFe 550Dmade to order: Fe 500D TMT
Roads and drainageWBM road with culvertsmade to order: Murram road, 4 m wide / Not included
BoundaryChain link fence 2.4 m
QualityNABL lab testing of materialsmade to order: Cube test reports per pour
MachineryBatching plant at site
Duration4-8 weeksmade to order: 3-6 months
Payment termsItem rate with retentionmade to order: Measured running bills

BARREL: Bharat Atom Renewable Resources Energy Limited