Catalogue / Cabling, trenching & HDD works
Horizontal directional drilling for road and rail crossings, Titan 7 seriesSample
by Ellorakavach Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Horizontal directional drilling for road and rail crossings from Ellorakavach, Titan 7 series: 5 cable route length options between 2 km and 50 km. Highlights: traffic management at crossings, drum handling and pulling tension control and dewatering in high water table. Typically used for industrial plant cabling, renewable plant internal networks and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ellorakavach
- Model
- ELL-C87 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length2 kmELL-C87-01 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length5 kmELL-C87-02 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length10 kmELL-C87-03 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length20 kmELL-C87-04 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length50 kmELL-C87-05 | Cable route length: 50 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 2 km to 50 km (see variants) |
|---|---|
| Method | Open trenchmade to order: Trenchless HDD / Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.5 m |
| Cable type | 11/33 kV XLPE |
| Jointing | Cold shrink |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Contractor arranges road cut approvalsmade to order: Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 300 m per day open trench |
| Crew | HDD crew of 8 with rig |