Catalogue / Installation & erection
Turbine tower and nacelle erection support, Pro 5 seriesSample
by Ellorakavach Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Ellorakavach Pro 5 turbine tower and nacelle erection support, offered in 6 installation scope options from 1 MW to 100 MW. Key features: material reconciliation reports, mobile team available for remote sites and torque-verified structure and module fixing. Used by utility solar parks, hybrid projects and c&I rooftop and ground mount. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ellorakavach
- Model
- ELL-C44 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 10 days
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWELL-C44-01 | Installation scope: 1 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope5 MWELL-C44-02 | Installation scope: 5 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope10 MWELL-C44-03 | Installation scope: 10 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope25 MWELL-C44-04 | Installation scope: 25 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope50 MWELL-C44-05 | Installation scope: 50 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope100 MWELL-C44-06 | Installation scope: 100 MW | 1 MW · Phased by block | for verified buyers |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Electrical BoP erectionmade to order: Structure and module installation / Complete mechanical and electrical erection |
| Manpower deployed | 60 technicians plus supervisors |
| Supervision | Site engineer and safety officermade to order: Project manager, engineers, QA/QC |
| Equipment | Own cranes and erection tools |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Daily toolbox talks, PPE, permitsmade to order: Lost-time-injury-free target, HIRA |
| Licence | Class A contractor registration |
| Insurance | CAR, WC and third-party liabilitymade to order: CAR and workmen compensation |
| Reporting | Weekly report with look-ahead plan |
| Payment terms | Milestone based with 10% retention |