Catalogue / Engineering & design

No photo yet

Substation and evacuation system design, Neo seriesSample

by Ellorakavach Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ellorakavach Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Substation and evacuation system design from Ellorakavach, Neo series: 4 plant capacity options between 5 MW and 50 MW. Key features: layout optimisation for land and shading, protection and relay coordination philosophy and yield and loss modelling aligned to bankable reports. Typically used for EPC contractors bidding for projects, captive and C&I solar owners and IPPs and developers. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ellorakavach
Model
ELL-A21 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
3-4 weeks
Warranty
Design correction at no cost for 12 months
Standards
CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity5 MWELL-A21-01Plant capacity: 5 MW1 job · 3-4 weekson quote
Plant capacity10 MWELL-A21-02Plant capacity: 10 MW1 job · 3-4 weekson quote
Plant capacity25 MWELL-A21-03Plant capacity: 25 MW1 job · 6-10 weekson quote
Plant capacity50 MWELL-A21-04Plant capacity: 50 MW1 job · 6-10 weekson quote

Specifications

Plant capacity5 MW to 50 MW (see variants)
DeliverablesDesign basis report plus drawings
Design softwarePVsyst, AutoCAD, ETAPmade to order: PVsyst, STAAD, ETAP, Civil 3D
TeamLead engineer plus 3 designersmade to order: Electrical, civil and SCADA discipline leads
Turnaround6-8 weeksmade to order: 3-4 weeks / 10-12 weeks
Revisions included2 roundsmade to order: 3 rounds / Unlimited until approval
Authority submission supportCEA/CEIG drawing approvalmade to order: DISCOM/STU drawing approval / None
Earthing and LA studyOptional add-on
FormatPDF and native CADmade to order: PDF, CAD and BIM model
Site visitOne visit included
Payment milestones30% advance, 40% on drafts, 30% on IFC

BARREL: Bharat Atom Renewable Resources Energy Limited