Catalogue / Trenchers & HDD rigs
Trenching machine on hire, Eco 2 seriesSample
by Ellora Machinery Rentals (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ellora Machinery Rentals (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Ellora Eco 2 trenching machine on hire, offered in 5 machine size options from Trencher 300 mm wide to HDD 20 t. Key features: drilling fluid managed and disposed, suitable for road and river crossings and crew experienced in cable duct work. Typically used for pipeline installations, cable routes in solar plants and road crossings for HT cable. Designed and tested to IS 4081, IS 14893 and ASTM F1962. Lead time 1-2 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ellora
- Model
- ELL-A09 series
- Listing type
- For rent
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 1-2 weeks
- Warranty
- Breakdown replacement within 72 h
- Standards
- IS 4081, IS 14893, ASTM F1962
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Machine sizeTrencher 300 mm wideELL-A09-01 | Machine size: Trencher 300 mm wide | 1 nos · 1-2 weeks | for verified buyers |
| Machine sizeTrencher 450 mm wideELL-A09-02 | Machine size: Trencher 450 mm wide | 1 nos · 1-2 weeks | for verified buyers |
| Machine sizeHDD 5 tELL-A09-03 | Machine size: HDD 5 t | 1 nos · 1-2 weeks | for verified buyers |
| Machine sizeHDD 10 tELL-A09-04 | Machine size: HDD 10 t | 1 nos · 1-2 weeks | for verified buyers |
| Machine sizeHDD 20 tELL-A09-05 | Machine size: HDD 20 t | 1 nos · 1-2 weeks | for verified buyers |
Specifications
| Machine size | Trencher 300 mm wide to HDD 20 t (see variants) |
|---|---|
| Trench depth | 1.0 m |
| Bore diameter | Up to 200 mm |
| Bore length | Up to 400 mmade to order: Up to 150 m |
| Operator | Includedmade to order: Not included |
| Support equipment | Mud mixing unit |
| Fuel | Included |
| Minimum hire | 1 weekmade to order: 1 month |
| Locator | Included |
| Mobilisation | Low-bed to site |
| Billing | Per metre |