Catalogue / Furnace & rectifier transformers

No photo yet

Submerged arc furnace transformer, Core 5 seriesSample

by Ellora Power Transformers (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ellora Power Transformers (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Submerged arc furnace transformer from Ellora, Core 5 series: 5 rating options between 10 MVA and 100 MVA. Key features: heavy-duty OLTC for many operations per day, optional built-in series reactor and low stray flux heating. Used by chlor-alkali, aluminium smelters and steel melting shops. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 28-36 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ellora
Model
ELL-919 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
28-36 weeks
Warranty
24 months
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating10 MVAELL-919-01Rating: 10 MVA1 nos · 28-36 weeksfor verified buyers
Rating20 MVAELL-919-02Rating: 20 MVA1 nos · 28-36 weeksfor verified buyers
Rating40 MVAELL-919-03Rating: 40 MVA1 nos · 28-36 weeksfor verified buyers
Rating60 MVAELL-919-04Rating: 60 MVA1 nos · 28-36 weeksfor verified buyers
Rating100 MVAELL-919-05Rating: 100 MVA1 nos · 28-36 weeksfor verified buyers

Specifications

Rating10 MVA to 100 MVA (see variants)
Primary voltage33 kVmade to order: 11 kV / 66 kV / 132 kV
Secondary voltageUp to 400 V DC rectified
ApplicationLRFmade to order: EAF / Rectifier / SAF
CoolingONAN/ONAFmade to order: OFWF / OFAF
Tap changerOff-circuitmade to order: OLTC
Secondary tapsUp to 21 steps
Vector groupDd0made to order: Dy11
Overload20% for 2 hours
Impedance6%
ReactorIn-built
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited