Catalogue / Ammonia & methanol synthesis equipment
CO2-to-methanol unit, Elite seriesSample
by Garudagen Hydrogen Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Garudagen Hydrogen Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Elite range of CO2-to-methanol unit by Garudagen covers 6 production capacity options (1 TPD to 300 TPD). Highlights: heat recovery to steam generation, remote operation with DCS and catalyst performance guarantee. Suited to fertiliser plants, chemical industry and green ammonia export. Designed and tested to ISO 22734, API 650 and ASME B31.3. Lead time 30-40 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Garudagen
- Model
- GAR-423 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 10 lot
- Lead time
- 30-40 weeks
- Warranty
- 24 months from commissioning
- Standards
- ISO 22734, API 650, ASME B31.3
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Production capacity1 TPDGAR-423-01 | Production capacity: 1 TPD | 10 lot · 30-40 weeks | for verified buyers |
| Production capacity5 TPDGAR-423-02 | Production capacity: 5 TPD | 10 lot · 30-40 weeks | for verified buyers |
| Production capacity20 TPDGAR-423-03 | Production capacity: 20 TPD | 10 lot · 30-40 weeks | for verified buyers |
| Production capacity50 TPDGAR-423-04 | Production capacity: 50 TPD | 10 lot · 30-40 weeks | for verified buyers |
| Production capacity100 TPDGAR-423-05 | Production capacity: 100 TPD | 10 lot · 50-70 weeks | for verified buyers |
| Production capacity300 TPDGAR-423-06 | Production capacity: 300 TPD | 10 lot · 50-70 weeks | for verified buyers |
Specifications
| Production capacity | 1 TPD to 300 TPD (see variants) |
|---|---|
| Product | Methanolmade to order: Ammonia |
| Synthesis pressure | 200 bar |
| Reactor temperature | 400-500 deg Cmade to order: 220-260 deg C |
| Catalyst | Cu/ZnO/Al2O3made to order: Iron based / Ruthenium based |
| Feedstock | Hydrogen and captured CO2 |
| N2 source | Cryogenic ASU |
| Turndown | 20-100% |
| Specific power | 9-10 MWh per tonne NH3 |
| Product purity | Grade AA methanolmade to order: 99.5% NH3 |
| Storage | Atmospheric tankmade to order: Refrigerated tank |
| Control | PLC |