Catalogue / Solar plant O&M & module cleaning

No photo yet

Solar plant O&M with performance monitoring, Core seriesSample

by Garudatron Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Garudatron Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Core service of solar plant O&M with performance monitoring by Garudatron covers 3 plant capacity options (25 MWp to 100 MWp). Key features: daily generation and loss analysis, soiling loss tracking and IV curve scanning of strings. Typically used for group captive plants, c&I rooftop owners and lender-monitored assets. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Baseline audit before takeover; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Garudatron
Model
GAR-267 series
Listing type
Service
Unit
MWp
Minimum order
1 MWp
Lead time
Baseline audit before takeover
Warranty
Availability guarantee with penalty
Standards
IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity25 MWpGAR-267-01Plant capacity: 25 MWp1 MWp · Baseline audit before takeoveron quote
Plant capacity50 MWpGAR-267-02Plant capacity: 50 MWp1 MWp · Baseline audit before takeoveron quote
Plant capacity100 MWpGAR-267-03Plant capacity: 100 MWp1 MWp · Baseline audit before takeoveron quote

Specifications

Plant capacity25 MWp to 100 MWp (see variants)
ScopeCleaning and routine checksmade to order: Full O&M with spare management / O&M plus asset management
Cleaning methodSemi-automatic wet
Cleaning frequencyMonthly in monsoonmade to order: Fortnightly / Weekly
Availability guaranteeGrid availability 99.5%
Manpower1 engineer plus 4 technicians per 10 MWmade to order: Plant manager plus 15 staff for 100 MW
SparesConsumables included
MonitoringWeekly PR and PLF report
Response time4 hours for critical faults
ReportingDashboard access for lendersmade to order: Monthly generation report
Contract term1 yearmade to order: 3 years / 5 years

BARREL: Bharat Atom Renewable Resources Energy Limited