Catalogue / Solar plant O&M & module cleaning
Inverter and SCADA maintenance, Titan 6 seriesSample
by Garudatron Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Garudatron Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Garudatron Titan 6 inverter and SCADA maintenance, offered in 6 plant capacity options from 5 MWp to 250 MWp. Key features: inventory and spares ledger, IV curve scanning of strings and soiling loss tracking. Typically used for group captive plants, c&I rooftop owners and lender-monitored assets. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Takeover in 2-3 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Garudatron
- Model
- GAR-627 series
- Listing type
- Service
- Unit
- MWp
- Minimum order
- 1 MWp
- Lead time
- Takeover in 2-3 weeks
- Warranty
- Service credits as per contract
- Standards
- IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWpGAR-627-01 | Plant capacity: 5 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity10 MWpGAR-627-02 | Plant capacity: 10 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity25 MWpGAR-627-03 | Plant capacity: 25 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity50 MWpGAR-627-04 | Plant capacity: 50 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity100 MWpGAR-627-05 | Plant capacity: 100 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity250 MWpGAR-627-06 | Plant capacity: 250 MWp | 1 MWp · Baseline audit before takeover | on quote |
Specifications
| Plant capacity | 5 MWp to 250 MWp (see variants) |
|---|---|
| Scope | O&M plus asset management |
| Cleaning method | Roboticmade to order: Semi-automatic wet / Waterless dry brush |
| Cleaning frequency | Weekly |
| Availability guarantee | Plant availability 99%made to order: Grid availability 99.5% |
| Manpower | 1 engineer plus 4 technicians per 10 MWmade to order: Plant manager plus 15 staff for 100 MW |
| Spares | Consumables included |
| Monitoring | Weekly PR and PLF reportmade to order: 24x7 remote SCADA |
| Response time | 24 hours |
| Reporting | Monthly generation reportmade to order: Dashboard access for lenders |
| Contract term | 1 yearmade to order: 3 years / 5 years |