Catalogue / Substation & line O&M
Substation O&M with 24x7 shift operation, Flex 8 seriesSample
by Garudatron Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Garudatron Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Substation O&M with 24x7 shift operation from Garudatron, Flex 8 series: 3 voltage level options between 66 kV and 220 kV. Design: fault analysis within 24 hours, permit-to-work and lockout-tagout and insulator and joint inspection. Suited to state utility outsourcing, railway and metro sub-stations and industrial captive substations. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Mobilisation in 2-3 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Garudatron
- Model
- GAR-0A8 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Mobilisation in 2-3 weeks
- Warranty
- Service credits for avoidable outages
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level66 kVGAR-0A8-01 | Voltage level: 66 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level132 kVGAR-0A8-02 | Voltage level: 132 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level220 kVGAR-0A8-03 | Voltage level: 220 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
Specifications
| Voltage level | 66 kV to 220 kV (see variants) |
|---|---|
| Scope | Maintenance only |
| Shift pattern | General shift plus on-call |
| Manpower | Two engineers plus 12 staffmade to order: Engineer plus 6 operators |
| Line patrolling | Quarterly drone patrolmade to order: Monthly foot patrol |
| Testing | Annual relay and CT/PT test |
| Statutory records | CEIG renewal supportmade to order: Log books, permits, shutdown register |
| Spares | Critical spares by owner |
| Response time | 2 hours for trip |
| Reporting | Monthly fault and maintenance reportmade to order: Real-time dashboards |
| Term | 1 year |