Catalogue / Grid connectivity & GNA applications
LTA-to-GNA transition advisory, Core seriesSample
by Garudatron Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Garudatron Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Garudatron Core LTA-to-GNA transition advisory, offered in 6 capacity applied options from 10 MW to 1000 MW. Design: handling of CTU queries, bank guarantee timeline tracking and support for relinquishment and transfer. Used by green hydrogen projects, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Garudatron
- Model
- GAR-0B3 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWGAR-0B3-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied50 MWGAR-0B3-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied100 MWGAR-0B3-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied250 MWGAR-0B3-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWGAR-0B3-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied1000 MWGAR-0B3-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | Bothmade to order: Connectivity / GNA |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged by client |
| Studies | Detailed power system study |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | Switchyard layout and GA drawingsmade to order: SLD, land proof, board resolution |
| Queries | Until grant |
| Fee basis | Fixedmade to order: Fixed plus success |