Catalogue / Grid connectivity & GNA applications

No photo yet

LTA-to-GNA transition advisory, Core seriesSample

by Garudatron Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Garudatron Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Garudatron Core LTA-to-GNA transition advisory, offered in 6 capacity applied options from 10 MW to 1000 MW. Design: handling of CTU queries, bank guarantee timeline tracking and support for relinquishment and transfer. Used by green hydrogen projects, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Garudatron
Model
GAR-0B3 series
Listing type
Service
Unit
application
Minimum order
1 application
Lead time
Grant 3-9 months
Warranty
Rework of deficient applications
Standards
CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Capacity applied10 MWGAR-0B3-01Capacity applied: 10 MW1 application · Grant 3-9 monthson quote
Capacity applied50 MWGAR-0B3-02Capacity applied: 50 MW1 application · Grant 3-9 monthson quote
Capacity applied100 MWGAR-0B3-03Capacity applied: 100 MW1 application · Grant 3-9 monthson quote
Capacity applied250 MWGAR-0B3-04Capacity applied: 250 MW1 application · Grant 3-9 monthson quote
Capacity applied500 MWGAR-0B3-05Capacity applied: 500 MW1 application · Grant 3-9 monthson quote
Capacity applied1000 MWGAR-0B3-06Capacity applied: 1000 MW1 application · Grant 3-9 monthson quote

Specifications

Capacity applied10 MW to 1000 MW (see variants)
ApplicationBothmade to order: Connectivity / GNA
ScopeDocument preparation and filingmade to order: End-to-end liaison
Bank guaranteeArranged by client
StudiesDetailed power system study
Portal handlingSTU portalmade to order: CTUIL portal
TeamRegulatory lead and engineermade to order: Dedicated manager
TimelineApproval 3-6 monthsmade to order: Filing in 2 weeks
Technical documentsSwitchyard layout and GA drawingsmade to order: SLD, land proof, board resolution
QueriesUntil grant
Fee basisFixedmade to order: Fixed plus success

BARREL: Bharat Atom Renewable Resources Energy Limited