Catalogue / Thermography & condition monitoring

No photo yet

Vibration and oil condition monitoring, Titan seriesSample

by Garudatron Consultants (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Garudatron Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Garudatron Titan vibration and oil condition monitoring, offered in 3 asset size options from 25 MW to 100 MW. Highlights: load condition recorded with each scan, re-scan after repair included and priority list of defects with repair advice. Used by solar plants (module and string hotspots), substation switchgear and transformers and wind turbine electrical systems. Delivered in line with ISO 18434-1, IEC 62446-3 and IEEE 1584. Mobilisation Report in 5-10 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Garudatron
Model
GAR-4E7 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 5-10 days
Warranty
Re-scan of repaired points at no cost
Standards
ISO 18434-1, IEC 62446-3, IEEE 1584
Delivers to
West India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Asset size25 MWGAR-4E7-01Asset size: 25 MW1 site · Report in 5-10 daysfor verified buyers
Asset size50 MWGAR-4E7-02Asset size: 50 MW1 site · Report in 5-10 daysfor verified buyers
Asset size100 MWGAR-4E7-03Asset size: 100 MW1 site · Report in 5-10 daysfor verified buyers

Specifications

Asset size25 MW to 100 MW (see variants)
TechniqueDrone thermal imaging
Camera resolution640x480 radiometric
DeliverableAnnotated hotspot report
Drone servicesGround sampling 3 cm per pixel
Defect classificationPer client maintenance policy
TeamLevel II thermographer plus pilot
CertificationISO 18436-7 trainedmade to order: Technicians with ASNT level II
TurnaroundReport in 10 daysmade to order: Report in 5 days
FrequencyAnnual or bi-annual plan
SoftwareCloud dashboard with trend historymade to order: Analyser software with thermal library

BARREL: Bharat Atom Renewable Resources Energy Limited