Catalogue / Live-line & hot-line washing
Bird guard and spacer fitting on live lines, Plus seriesSample
by Garudatron Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Garudatron Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Plus service of bird guard and spacer fitting on live lines by Garudatron covers 6 voltage level options (11 kV to 400 kV). Key features: no outage required for washing, utility permit coordination and leakage current monitoring. Used by substations in dusty regions, coastal and industrial pollution zones and renewable evacuation lines. Delivered in line with IEC 60815, CEA (Measures relating to Safety) Regulations and IEEE 957. Mobilisation Mobilisation in 5-7 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Garudatron
- Model
- GAR-E72 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 5-7 days
- Warranty
- As per contract
- Standards
- IEC 60815, CEA (Measures relating to Safety) Regulations, IEEE 957
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level11 kVGAR-E72-01 | Voltage level: 11 kV | 1 job · Mobilisation in 5-7 days | on quote |
| Voltage level33 kVGAR-E72-02 | Voltage level: 33 kV | 1 job · Mobilisation in 5-7 days | on quote |
| Voltage level66 kVGAR-E72-03 | Voltage level: 66 kV | 1 job · Mobilisation in 5-7 days | on quote |
| Voltage level132 kVGAR-E72-04 | Voltage level: 132 kV | 1 job · Mobilisation in 5-7 days | on quote |
| Voltage level220 kVGAR-E72-05 | Voltage level: 220 kV | 1 job · Permit based scheduling | on quote |
| Voltage level400 kVGAR-E72-06 | Voltage level: 400 kV | 1 job · Permit based scheduling | on quote |
Specifications
| Voltage level | 11 kV to 400 kV (see variants) |
|---|---|
| Method | Drone washingmade to order: Pressurised water jet / Dry ice blasting / Robotic cleaning |
| Resistivity of water | Above 5000 ohm-cm |
| Scope | Per baymade to order: Per tower / Per km of line |
| Frequency | Pre-monsoonmade to order: Quarterly in coastal areas / Pre- and post-monsoon |
| Crew | Team of 5 with live-line operatormade to order: Linemen with insulated platform |
| Tools | Insulated hot sticks, bucket truckmade to order: Bucket with insulated boom |
| Safety | Approved method statement |
| Outputs | Photo log of insulatorsmade to order: Pre and post leakage current |
| Productivity | 100 insulators per daymade to order: 30 towers per day |
| Licence | Trained under utility protocols |