Catalogue / Fuel-gas conditioning & pressure-reducing skids
Gas metering skid with ultrasonic meter, Pro seriesSample
by Gupta Gas Power Systems (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Gupta Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Gas metering skid with ultrasonic meter from Gupta, Pro series: 6 flow capacity options between 1000 Sm3/h and 100000 Sm3/h. Highlights: condensate drain management, skid mounted and factory tested and redundant regulator runs for continuity. Suited to gas engine plants, gas turbine plants and industrial gas consumers. Designed and tested to IS 3589, ASME B31.8 and PNGRB T4S. Lead time 16-22 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Gupta
- Model
- GUP-673 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 16-22 weeks
- Warranty
- 18 months
- Standards
- IS 3589, ASME B31.8, PNGRB T4S
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Flow capacity1000 Sm3/hGUP-673-01 | Flow capacity: 1000 Sm3/h | 10 nos · 16-22 weeks | on quote |
| Flow capacity5000 Sm3/hGUP-673-02 | Flow capacity: 5000 Sm3/h | 10 nos · 16-22 weeks | on quote |
| Flow capacity10000 Sm3/hGUP-673-03 | Flow capacity: 10000 Sm3/h | 10 nos · 16-22 weeks | on quote |
| Flow capacity25000 Sm3/hGUP-673-04 | Flow capacity: 25000 Sm3/h | 10 nos · 16-22 weeks | on quote |
| Flow capacity50000 Sm3/hGUP-673-05 | Flow capacity: 50000 Sm3/h | 10 nos · 16-22 weeks | on quote |
| Flow capacity100000 Sm3/hGUP-673-06 | Flow capacity: 100000 Sm3/h | 10 nos · 16-22 weeks | on quote |
Specifications
| Flow capacity | 1000 Sm3/h to 100000 Sm3/h (see variants) |
|---|---|
| Inlet pressure | 16-70 barmade to order: 25-100 bar |
| Outlet pressure | 4 bar |
| Pressure regulation | Active-monitor redundant |
| Filtration | Coalescer separator, 5 micronmade to order: Cartridge filter |
| Heating | Water bath |
| Metering | Ultrasonicmade to order: Turbine / Coriolis |
| Pipe class | ANSI 300 |
| Material | Carbon steel A106 |
| Safety | Slam shut-off, relief valve |
| Hazardous area | Zone 1 Gr IIA T3 |