Catalogue / Transformer overhaul & oil filtration

No photo yet

DGA based diagnostics and reclamation, Plus 8 seriesSample

by Guptaphase Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Guptaphase Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Guptaphase Plus 8 DGA based diagnostics and reclamation, offered in 4 transformer rating options from 1 MVA to 20 MVA. Key features: leak testing before energisation, post-work tan delta and ratio tests and core insulation resistance checks. Used by industrial distribution transformers, solar and wind pooling substations and state utility asset life extension. Delivered in line with IS 335 (Mineral Insulating Oil), IS 1866 (Oil Maintenance) and IEC 60422. Mobilisation Planned shutdown required; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Guptaphase
Model
GUP-C08 series
Listing type
Service
Unit
nos
Minimum order
1 nos
Lead time
Planned shutdown required
Warranty
Workmanship 12 months
Standards
IS 335 (Mineral Insulating Oil), IS 1866 (Oil Maintenance), IEC 60422
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating1 MVAGUP-C08-01Transformer rating: 1 MVA1 nos · Planned shutdown requiredon quote
Transformer rating5 MVAGUP-C08-02Transformer rating: 5 MVA1 nos · Planned shutdown requiredon quote
Transformer rating10 MVAGUP-C08-03Transformer rating: 10 MVA1 nos · Planned shutdown requiredon quote
Transformer rating20 MVAGUP-C08-04Transformer rating: 20 MVA1 nos · Planned shutdown requiredon quote

Specifications

Transformer rating1 MVA to 20 MVA (see variants)
ServiceOil reclamationmade to order: Oil filtration and dehydration / Internal inspection and overhaul / Full overhaul with rewinding
Filtration machineVacuum dehydration 6000 L/hr
Oil BDV targetAbove 60 kVmade to order: Above 70 kV
Moisture targetBelow 10 ppmmade to order: Below 5 ppm
TestingFull routine tests after overhaulmade to order: DGA, furan, BDV, tan delta
SparesGaskets and silica gelmade to order: Bushings and OLTC parts at cost
Downtime5-7 days
Site workWorkshop repairmade to order: Hot oil circulation at site
CrewSpecialised overhaul teammade to order: 4 technicians with supervisor
CertificateOverhaul report with test datamade to order: Oil test report from NABL lab

BARREL: Bharat Atom Renewable Resources Energy Limited