Catalogue / Power system studies (load flow, short circuit, grid code)
Protection coordination and relay setting, Xtra 9 seriesSample
by Guptaphase Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Guptaphase Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Xtra 9 service of protection coordination and relay setting by Guptaphase covers 6 network scale options (11 kV plant to 400 kV system). Key features: reports for GNA/connectivity application, models acceptable to STU and CTUIL and reactive power capability curves. Used by industrial plants adding generation, utilities and consultants and BESS integrators. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Guptaphase
- Model
- GUP-F12 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantGUP-F12-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale33 kV plantGUP-F12-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale66 kV systemGUP-F12-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | on quote |
| Network scale132 kV systemGUP-F12-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemGUP-F12-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemGUP-F12-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Protection coordination |
| Software | ETAPmade to order: PSS/E / DIgSILENT PowerFactory |
| Model data | Utility network modelmade to order: Client single line diagram and data |
| Deliverables | Model files and relay settings |
| Grid code checks | LVRT/HVRT and ramp ratemade to order: Voltage and reactive power capability |
| Review | Utility submission support |
| Scenarios | Multiple dispatch casesmade to order: Normal and N-1 |
| Team | Power system engineermade to order: Lead plus modelling specialist |
| Turnaround | 2-3 weeks |
| Validation | Compared with measured data |