Catalogue / Substation & line O&M
Battery bank and DC system maintenance, Ultra 5 seriesSample
by Guptaphase Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Guptaphase Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Battery bank and DC system maintenance from Guptaphase, Ultra 5 series: 4 voltage level options between 66 kV and 400 kV. Highlights: fault analysis within 24 hours, insulator and joint inspection and permit-to-work and lockout-tagout. Suited to industrial captive substations, railway and metro sub-stations and renewable pooling substations. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Mobilisation in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Guptaphase
- Model
- GUP-CB5 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Mobilisation in 2-3 weeks
- Warranty
- As per contract
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level66 kVGUP-CB5-01 | Voltage level: 66 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level132 kVGUP-CB5-02 | Voltage level: 132 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level220 kVGUP-CB5-03 | Voltage level: 220 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level400 kVGUP-CB5-04 | Voltage level: 400 kV | 1 month · Baseline condition audit first | on quote |
Specifications
| Voltage level | 66 kV to 400 kV (see variants) |
|---|---|
| Scope | Operation, maintenance and statutory compliancemade to order: Operation and maintenance / Maintenance only |
| Shift pattern | 3 shifts, 24x7 |
| Manpower | Engineer plus 6 operators |
| Line patrolling | Quarterly drone patrol |
| Testing | Annual relay and CT/PT test |
| Statutory records | Log books, permits, shutdown register |
| Spares | Consumables included |
| Response time | 2 hours for tripmade to order: 4 hours |
| Reporting | Real-time dashboards |
| Term | 3 yearsmade to order: 1 year |