Catalogue / Resource assessment (solar, wind, hydro)
Energy yield assessment P50 and P90, Eco 5 seriesSample
by Guptaphase Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Guptaphase Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Energy yield assessment P50 and P90 from Guptaphase, Eco 5 series: 6 measurement duration options between Desktop study and 24 months. Key features: loss factors for local conditions, extreme wind and wake studies and independent bankable estimate. Suited to wind and solar developers, hybrid project planners and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Guptaphase
- Model
- GUP-EB2 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyGUP-EB2-01 | Measurement duration: Desktop study | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration3 monthsGUP-EB2-02 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration6 monthsGUP-EB2-03 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration12 monthsGUP-EB2-04 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration18 monthsGUP-EB2-05 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration24 monthsGUP-EB2-06 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | for verified buyers |
Specifications
| Measurement duration | Desktop study to 24 months (see variants) |
|---|---|
| Technology | Small hydro |
| Data source | Satellite and reanalysis |
| Equipment | 80-120 m met mast with LiDARmade to order: Class A pyranometer station |
| Uncertainty | P50/P90 with uncertainty budgetmade to order: Bankable assessment |
| Modelling | WAsP, WindPRO |
| Deliverable | Hourly time series dataset |
| Calibration | Traceable calibration |
| Site count | Single site |
| Maintenance | Remote health checksmade to order: Quarterly site visit |
| Turnaround | Report in 3 weeks |