Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Energy yield assessment P50 and P90, Eco 5 seriesSample

by Guptaphase Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Guptaphase Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Energy yield assessment P50 and P90 from Guptaphase, Eco 5 series: 6 measurement duration options between Desktop study and 24 months. Key features: loss factors for local conditions, extreme wind and wake studies and independent bankable estimate. Suited to wind and solar developers, hybrid project planners and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Guptaphase
Model
GUP-EB2 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
As per contract
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
South India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studyGUP-EB2-01Measurement duration: Desktop study1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration3 monthsGUP-EB2-02Measurement duration: 3 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration6 monthsGUP-EB2-03Measurement duration: 6 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration12 monthsGUP-EB2-04Measurement duration: 12 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration18 monthsGUP-EB2-05Measurement duration: 18 months1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration24 monthsGUP-EB2-06Measurement duration: 24 months1 report · Campaign 3-24 monthsfor verified buyers

Specifications

Measurement durationDesktop study to 24 months (see variants)
TechnologySmall hydro
Data sourceSatellite and reanalysis
Equipment80-120 m met mast with LiDARmade to order: Class A pyranometer station
UncertaintyP50/P90 with uncertainty budgetmade to order: Bankable assessment
ModellingWAsP, WindPRO
DeliverableHourly time series dataset
CalibrationTraceable calibration
Site countSingle site
MaintenanceRemote health checksmade to order: Quarterly site visit
TurnaroundReport in 3 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited