Catalogue / Civil & foundation works

No photo yet

Pre-cast and cast-in-situ foundations for transformers, Volt seriesSample

by Hampiurja Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Hampiurja Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Hampiurja Volt pre-cast and cast-in-situ foundations for transformers, offered in 4 works volume options from 10 MW equivalent to 100 MW equivalent. Design: daily quantity and progress log, waterproofing for cable trenches and local labour employed where possible. Typically used for solar parks, industrial plants and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Hampiurja
Model
HAM-472 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume10 MW equivalentHAM-472-01Works volume: 10 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume25 MW equivalentHAM-472-02Works volume: 25 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume50 MW equivalentHAM-472-03Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote
Works volume100 MW equivalentHAM-472-04Works volume: 100 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume10 MW equivalent to 100 MW equivalent (see variants)
Foundation typeDriven steel pile
Concrete gradeM25made to order: M30 / M40 for turbine foundation
Pull-out testingRandom test plus lateral load
ReinforcementFe 550D
Roads and drainageMurram road, 4 m widemade to order: WBM road with culverts / Not included
BoundaryCompound wall with barbed wire
QualityCube test reports per pour
MachineryBatching plant at site
Duration3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited