Catalogue / Civil & foundation works
Pre-cast and cast-in-situ foundations for transformers, Volt seriesSample
by Hampiurja Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hampiurja Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Hampiurja Volt pre-cast and cast-in-situ foundations for transformers, offered in 4 works volume options from 10 MW equivalent to 100 MW equivalent. Design: daily quantity and progress log, waterproofing for cable trenches and local labour employed where possible. Typically used for solar parks, industrial plants and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hampiurja
- Model
- HAM-472 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume10 MW equivalentHAM-472-01 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentHAM-472-02 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume50 MW equivalentHAM-472-03 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume100 MW equivalentHAM-472-04 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 10 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | Driven steel pile |
| Concrete grade | M25made to order: M30 / M40 for turbine foundation |
| Pull-out testing | Random test plus lateral load |
| Reinforcement | Fe 550D |
| Roads and drainage | Murram road, 4 m widemade to order: WBM road with culverts / Not included |
| Boundary | Compound wall with barbed wire |
| Quality | Cube test reports per pour |
| Machinery | Batching plant at site |
| Duration | 3-6 months |
| Payment terms | Item rate with retention |