Catalogue / Solar & wind BoP construction

No photo yet

Control room and SCADA works, Prime 7 seriesSample

by Hampiurja Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Hampiurja Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Prime 7 service of control room and SCADA works by Hampiurja covers 3 project size options (10 MW to 50 MW). Highlights: cable route survey and marking, trench depth and sand bedding as per standard and cable tray and glanding workmanship. Typically used for IPPs managing multiple packages, wind-solar hybrid parks and c&I ground mount. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Hampiurja
Model
HAM-9E4 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Mobilisation in 14 days
Warranty
Defect liability 24 months
Standards
IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Project size10 MWHAM-9E4-01Project size: 10 MW1 MW · Mobilisation in 14 dayson quote
Project size25 MWHAM-9E4-02Project size: 25 MW1 MW · Mobilisation in 14 dayson quote
Project size50 MWHAM-9E4-03Project size: 50 MW1 MW · Mobilisation in 14 dayson quote

Specifications

Project size10 MW to 50 MW (see variants)
ScopeCabling and earthing
DC cables6 sq mm solar cable
MV cables33 kV XLPE Al armouredmade to order: 33 kV XLPE Cu
Inverter stationSkid or containerisedmade to order: Brick built room
Lightning protectionFranklin rod with mastmade to order: ESE system
Crew size80 personsmade to order: 150 persons / 300 persons
EquipmentOwn fleet
QualityMegger and continuity records
Duration3-5 monthsmade to order: 6-9 months
PaymentMilestone basedmade to order: Monthly measured bills

BARREL: Bharat Atom Renewable Resources Energy Limited