Catalogue / Cabling, trenching & HDD works
Cable trenching and laying for power and control cables, Neo 8 seriesSample
by Hampiurja Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hampiurja Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Cable trenching and laying for power and control cables from Hampiurja, Neo 8 series: 4 cable route length options between 5 km and 50 km. Design: drum handling and pulling tension control, warning tape and marker installation and dewatering in high water table. Used by industrial plant cabling, railway and highway crossings and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hampiurja
- Model
- HAM-B57 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length5 kmHAM-B57-01 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmHAM-B57-02 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length20 kmHAM-B57-03 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmHAM-B57-04 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 5 km to 50 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossingsmade to order: Open trench / Trenchless HDD |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | 11/33 kV XLPEmade to order: LT armoured |
| Jointing | Cold shrink |
| Restoration | Road and footpath restoration |
| Permissions | Client arrangesmade to order: Contractor arranges road cut approvals |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |