Catalogue / Electric & electrode boilers

No photo yet

Electrode steam boiler, Neo seriesSample

by Hertzgen Furnaces (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Hertzgen Furnaces (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Hertzgen Neo electrode steam boiler, offered in 5 capacity options from 500 kW to 10 MW. Design: heat storage compatible, zero local emissions and dry-fire protection and low-water cut-off. Suited to paper and board, pharma steam and textile and laundry. Designed and tested to IBR 1950, IS 2825 and IEC 60519-1. Lead time 8-12 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Hertzgen
Model
HER-425 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
8-12 weeks
Warranty
24 months on elements
Standards
IBR 1950, IS 2825, IEC 60519-1
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR site, freight included
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Capacity500 kWHER-425-01Capacity: 500 kW1 nos · 8-12 weeksfor verified buyers
Capacity1 MWHER-425-02Capacity: 1 MW1 nos · 8-12 weeksfor verified buyers
Capacity2.5 MWHER-425-03Capacity: 2.5 MW1 nos · 8-12 weeksfor verified buyers
Capacity5 MWHER-425-04Capacity: 5 MW1 nos · 14-18 weeksfor verified buyers
Capacity10 MWHER-425-05Capacity: 10 MW1 nos · 14-18 weeksfor verified buyers

Specifications

Capacity500 kW to 10 MW (see variants)
TypeThermic fluidmade to order: Resistance / Electrode
Steam output0.15 TPHmade to order: 0.7 TPH / 1.4 TPH / 3.5 TPH
Working pressure35 bar
Supply voltage6.6 kV
Efficiency98-99.5%
Turndown10-100%
Start-up time< 20 min cold
ControlPLC with SCADA
Water qualityFeedwater TDS < 100 ppm
Pressure vesselIBR approved
Boiler housePackaged skid

BARREL: Bharat Atom Renewable Resources Energy Limited