Catalogue / Induction & arc furnaces
Coreless induction furnace, Neo seriesSample
by Hertzgen Furnaces (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hertzgen Furnaces (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo range of coreless induction furnace by Hertzgen covers 4 furnace capacity options (3 MT to 25 MT). Design: waste heat recovery option, fume extraction integrated and thyristor or IGBT power supply with soft start. Suited to steel foundries, casting units and rolling mill billet makers. Designed and tested to IS 3043, IEC 60519-3 and IEC 60519-6. Lead time 20-30 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hertzgen
- Model
- HER-796 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 20-30 weeks
- Warranty
- 18 months
- Standards
- IS 3043, IEC 60519-3, IEC 60519-6
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Furnace capacity3 MTHER-796-01 | Furnace capacity: 3 MT | 1 nos · 20-30 weeks | for verified buyers |
| Furnace capacity6 MTHER-796-02 | Furnace capacity: 6 MT | 1 nos · 20-30 weeks | for verified buyers |
| Furnace capacity12 MTHER-796-03 | Furnace capacity: 12 MT | 1 nos · 20-30 weeks | for verified buyers |
| Furnace capacity25 MTHER-796-04 | Furnace capacity: 25 MT | 1 nos · 20-30 weeks | for verified buyers |
Specifications
| Furnace capacity | 3 MT to 25 MT (see variants) |
|---|---|
| Type | Electric arcmade to order: Coreless induction / Channel induction / Submerged arc |
| Power supply | 30 MW |
| Frequency | 250 Hzmade to order: 500 Hz / 1000 Hz |
| Charge material | Coppermade to order: Steel scrap / Cast iron / DRI/HBI |
| Melt time per heat | 60-75 minmade to order: 45 min |
| Specific energy | 380-420 kWh/MTmade to order: 560-620 kWh/MT |
| Cooling | Closed-loop water circuit |
| Tilting | Hydraulic |
| Lining | Neutral lining |
| Power factor | 0.95 with capacitor bank |
| Dust extraction | Fume hood and bag filter |