Catalogue / Induction & arc furnaces
Coreless induction furnace, Neo seriesSample
by Hertzgen Furnaces (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hertzgen Furnaces (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo range of coreless induction furnace by Hertzgen covers 5 furnace capacity options (1 MT to 25 MT). Highlights: waste heat recovery option, earth leakage detector for lining failure and melt-down sequence PLC. Typically used for steel foundries, ferro-alloys and casting units. Designed and tested to IS 3043, IEC 60519-3 and IEC 60519-6. Lead time 10-14 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hertzgen
- Model
- HER-796 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 10-14 weeks
- Warranty
- 18 months
- Standards
- IS 3043, IEC 60519-3, IEC 60519-6
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Corrugated box on pallet
- Delivery terms
- Door delivery in metro cities
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Furnace capacity1 MTHER-796-01 | Furnace capacity: 1 MT | 2 nos · 10-14 weeks | for verified buyers |
| Furnace capacity3 MTHER-796-02 | Furnace capacity: 3 MT | 2 nos · 10-14 weeks | for verified buyers |
| Furnace capacity6 MTHER-796-03 | Furnace capacity: 6 MT | 2 nos · 10-14 weeks | for verified buyers |
| Furnace capacity12 MTHER-796-04 | Furnace capacity: 12 MT | 2 nos · 20-30 weeks | for verified buyers |
| Furnace capacity25 MTHER-796-05 | Furnace capacity: 25 MT | 2 nos · 20-30 weeks | for verified buyers |
Specifications
| Furnace capacity | 1 MT to 25 MT (see variants) |
|---|---|
| Type | Electric arc |
| Power supply | 1.5 MW |
| Frequency | 250 Hz |
| Charge material | Copper |
| Melt time per heat | 45 minmade to order: 60-75 min |
| Specific energy | 560-620 kWh/MTmade to order: 380-420 kWh/MT |
| Cooling | Closed-loop water circuit |
| Tilting | Hydraulic |
| Lining | Acid ramming massmade to order: Neutral lining |
| Power factor | 0.95 with capacitor bank |
| Dust extraction | Fume hood and bag filter |