Catalogue / Flue-gas desulphurisation (FGD)
Semi-dry FGD with spray dryer, Xtra 8 seriesSample
by Hertzline Emission Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hertzline Emission Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Xtra 8 range of semi-dry FGD with spray dryer by Hertzline covers 6 boiler size options (25 MW to 500 MW). Highlights: online SO2 analyser interface, corrosion resistant internals and gypsum bleed with dewatering. Used by industrial boilers, captive power plants and coal fired thermal plants. Designed and tested to MoEF&CC notification 2015, IS 11255 and CPCB norms. Lead time 24-36 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hertzline
- Model
- HER-059 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 5 set
- Lead time
- 24-36 weeks
- Warranty
- 12 months from commissioning
- Standards
- MoEF&CC notification 2015, IS 11255, CPCB norms
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Boiler size25 MWHER-059-01 | Boiler size: 25 MW | 5 set · 24-36 weeks | for verified buyers |
| Boiler size60 MWHER-059-02 | Boiler size: 60 MW | 5 set · 24-36 weeks | for verified buyers |
| Boiler size120 MWHER-059-03 | Boiler size: 120 MW | 5 set · 24-36 weeks | for verified buyers |
| Boiler size210 MWHER-059-04 | Boiler size: 210 MW | 5 set · 24-36 weeks | for verified buyers |
| Boiler size350 MWHER-059-05 | Boiler size: 350 MW | 5 set · 40-60 weeks | for verified buyers |
| Boiler size500 MWHER-059-06 | Boiler size: 500 MW | 5 set · 40-60 weeks | for verified buyers |
Specifications
| Boiler size | 25 MW to 500 MW (see variants) |
|---|---|
| Technology | Semi-drymade to order: Wet limestone-gypsum / Dry sorbent |
| SO2 removal efficiency | 80%made to order: 90% / 95% |
| Inlet SO2 | Up to 2500 mg/Nm3made to order: Up to 1500 mg/Nm3 |
| Absorber material | Alloy lined |
| Reagent | Lime |
| Gypsum quality | Disposal grade |
| Water consumption | Standardmade to order: Low |
| Control | Standalone PLCmade to order: DCS integrated |
| Chimney | Wet stack liner |