Catalogue / Installation & erection
Cable laying, termination and earthing installation, Eco seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco service of cable laying, termination and earthing installation by Hoysala covers 4 installation scope options (25 MW to 200 MW). Highlights: punch list closure before testing, cable route marking and tray fixing and material reconciliation reports. Typically used for hybrid projects, utility solar parks and wind farm substations. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-DD1 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Phased by block
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope25 MWHOY-DD1-01 | Installation scope: 25 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope50 MWHOY-DD1-02 | Installation scope: 50 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope100 MWHOY-DD1-03 | Installation scope: 100 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope200 MWHOY-DD1-04 | Installation scope: 200 MW | 1 MW · Phased by block | for verified buyers |
Specifications
| Installation scope | 25 MW to 200 MW (see variants) |
|---|---|
| Scope | Complete mechanical and electrical erectionmade to order: Structure and module installation / Electrical BoP erection |
| Manpower deployed | 25 technicians per MW-block |
| Supervision | Project manager, engineers, QA/QC |
| Equipment | Pile driver, crane, telehandlermade to order: Own cranes and erection tools |
| Quality plan | Client-approved ITPmade to order: ISO 9001 QAP with hold points |
| Safety | Lost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits |
| Licence | Electrical contractor licence |
| Insurance | CAR, WC and third-party liabilitymade to order: CAR and workmen compensation |
| Reporting | Daily progress report |
| Payment terms | Monthly running billsmade to order: Milestone based with 10% retention |