Catalogue / Cabling, trenching & HDD works
Cable trenching and laying for power and control cables, Edge seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge service of cable trenching and laying for power and control cables by Hoysala covers 3 cable route length options (5 km to 20 km). Highlights: warning tape and marker installation, utility locating before excavation and dewatering in high water table. Used by railway and highway crossings, urban distribution upgrades and renewable plant internal networks. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-B54 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length5 kmHOY-B54-01 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmHOY-B54-02 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length20 kmHOY-B54-03 | Cable route length: 20 km | 1 km · Mobilisation in 7 days | on quote |
Specifications
| Cable route length | 5 km to 20 km (see variants) |
|---|---|
| Method | Open trench |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.5 m |
| Cable type | 11/33 kV XLPEmade to order: LT armoured |
| Jointing | Premoulded |
| Restoration | Backfill and compaction only |
| Permissions | Contractor arranges road cut approvals |
| Testing | Hipot and sheath test |
| Productivity | 300 m per day open trench |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |