Catalogue / Civil & foundation works

No photo yet

Wind turbine foundation construction, Flex 3 seriesSample

by Hoysala Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Wind turbine foundation construction from Hoysala, Flex 3 series: 6 works volume options between 1 MW equivalent and 100 MW equivalent. Key features: cube and pile test records, daily quantity and progress log and local labour employed where possible. Used by substations and control rooms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Hoysala
Model
HOY-258 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentHOY-258-01Works volume: 1 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume5 MW equivalentHOY-258-02Works volume: 5 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume10 MW equivalentHOY-258-03Works volume: 10 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume25 MW equivalentHOY-258-04Works volume: 25 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume50 MW equivalentHOY-258-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume100 MW equivalentHOY-258-06Works volume: 100 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume1 MW equivalent to 100 MW equivalent (see variants)
Foundation typeRamming or screw pile
Concrete gradeM25made to order: M30 / M40 for turbine foundation
Pull-out testingRandom test plus lateral loadmade to order: 2% piles tested
ReinforcementFe 550Dmade to order: Fe 500D TMT
Roads and drainageNot includedmade to order: Murram road, 4 m wide / WBM road with culverts
BoundaryCompound wall with barbed wire
QualityCube test reports per pour
MachineryPiling rigs and excavators
Duration3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited