Catalogue / Civil & foundation works
Wind turbine foundation construction, Flex 3 seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Wind turbine foundation construction from Hoysala, Flex 3 series: 6 works volume options between 1 MW equivalent and 100 MW equivalent. Key features: cube and pile test records, daily quantity and progress log and local labour employed where possible. Used by substations and control rooms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-258 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentHOY-258-01 | Works volume: 1 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume5 MW equivalentHOY-258-02 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume10 MW equivalentHOY-258-03 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume25 MW equivalentHOY-258-04 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume50 MW equivalentHOY-258-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume100 MW equivalentHOY-258-06 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
Specifications
| Works volume | 1 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | Ramming or screw pile |
| Concrete grade | M25made to order: M30 / M40 for turbine foundation |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | Not includedmade to order: Murram road, 4 m wide / WBM road with culverts |
| Boundary | Compound wall with barbed wire |
| Quality | Cube test reports per pour |
| Machinery | Piling rigs and excavators |
| Duration | 3-6 months |
| Payment terms | Item rate with retention |