Catalogue / Power system studies (load flow, short circuit, grid code)
Harmonic and power quality study, Ultra seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Hoysala Ultra harmonic and power quality study, offered in 6 network scale options from 11 kV plant to 400 kV system. Highlights: PSS/E and PSCAD model support, reports for GNA/connectivity application and reactive power capability curves. Suited to renewable developers seeking connectivity, BESS integrators and industrial plants adding generation. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-4B4 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantHOY-4B4-01 | Network scale: 11 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale33 kV plantHOY-4B4-02 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale66 kV systemHOY-4B4-03 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale132 kV systemHOY-4B4-04 | Network scale: 132 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale220 kV systemHOY-4B4-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemHOY-4B4-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Load flow and short circuitmade to order: Dynamic and transient / Harmonics / Protection coordination |
| Software | PSS/Emade to order: ETAP / DIgSILENT PowerFactory |
| Model data | Utility network modelmade to order: Client single line diagram and data |
| Deliverables | Model files and relay settingsmade to order: Study report with results |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender reviewmade to order: Utility submission support |
| Scenarios | Multiple dispatch casesmade to order: Normal and N-1 |
| Team | Lead plus modelling specialist |
| Turnaround | 4-6 weeks |
| Validation | Compared with measured data |