Catalogue / Feasibility studies & DPR
Pre-feasibility study for BESS and pumped storage, Neo 2 seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Pre-feasibility study for BESS and pumped storage from Hoysala, Neo 2 series: 3 project capacity options between 1 MW and 10 MW. Highlights: capex and opex benchmarks for Indian market, alternative configuration comparison and statutory approvals roadmap. Used by developers and IPPs, state agencies and funds and lenders. Delivered in line with MNRE Guidelines, CERC Tariff Regulations and IEC 61724-1. Mobilisation 3-12 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-BB1 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 3-12 weeks
- Warranty
- As per contract
- Standards
- MNRE Guidelines, CERC Tariff Regulations, IEC 61724-1
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project capacity1 MWHOY-BB1-01 | Project capacity: 1 MW | 1 report · 3-12 weeks | on quote |
| Project capacity5 MWHOY-BB1-02 | Project capacity: 5 MW | 1 report · 3-12 weeks | on quote |
| Project capacity10 MWHOY-BB1-03 | Project capacity: 10 MW | 1 report · 3-12 weeks | on quote |
Specifications
| Project capacity | 1 MW to 10 MW (see variants) |
|---|---|
| Scope | Pre-feasibility |
| Energy yield | PVsyst P50/P90made to order: WAsP wind energy assessment |
| Financial model | Project IRR, equity IRR, DSCR |
| Grid assessment | GNA/connectivity route study |
| Site visit | Two visits with geotechmade to order: One visit with drone survey |
| Environmental screening | Includedmade to order: Optional add-on |
| Team | Multi-disciplinary team of 5made to order: Lead consultant and analyst |
| Turnaround | 10-12 weeksmade to order: 3-4 weeks / 6-8 weeks |
| Deliverable | Report, model and presentationmade to order: PDF report with Excel model |
| Review rounds | One |