Catalogue / Transmission line erection & stringing

No photo yet

66 kV and 132 kV line construction, Duo seriesSample

by Hoysala Logistics (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Hoysala Duo 66 kV and 132 kV line construction, offered in 3 voltage level options from 132 kV to 400 kV. Design: tower verticality and bolt tightening records, sag and tension charts for stringing and tension check and final clearance survey. Typically used for state transmission utilities, railway traction feed and solar and wind evacuation lines. Delivered in line with IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles) and CEA (Measures relating to Safety) Regulations. Mobilisation Per section schedule; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Hoysala
Model
HOY-7B5 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Per section schedule
Warranty
Workmanship 12 months
Standards
IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles), CEA (Measures relating to Safety) Regulations
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Voltage level132 kVHOY-7B5-01Voltage level: 132 kV1 km · Per section scheduleon quote
Voltage level220 kVHOY-7B5-02Voltage level: 220 kV1 km · Per section scheduleon quote
Voltage level400 kVHOY-7B5-03Voltage level: 400 kV1 km · Per section scheduleon quote

Specifications

Voltage level132 kV to 400 kV (see variants)
Circuit typeMulti-circuit on narrow base
ConductorACSR Panther
ScopeFoundation, erection and stringing
Stringing methodTension stringing
CrewTwo erection gangs plus foundation team
Tower testingPrototype test witnessed
Productivity3 km per weekmade to order: 1-1.5 km per week
Approvals supportPTCC clearance and RoWmade to order: Forest and crossing permission
SafetyFall protection and line clearancemade to order: Live-line crossing precautions
InsuranceCAR and workmen compensationmade to order: Third-party liability

BARREL: Bharat Atom Renewable Resources Energy Limited