Catalogue / Testing & commissioning
Pre-commissioning tests and energisation, Duo 7 seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Pre-commissioning tests and energisation from Hoysala, Duo 7 series: 6 plant capacity options between 5 MW and 250 MW. Highlights: handover training to O&M team, test formats agreed before mobilisation and commissioning certificates for lenders. Suited to DISCOM and STU charging, lender completion tests and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-8F8 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 5 days
- Warranty
- Retest at no cost if failure traced to test error
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWHOY-8F8-01 | Plant capacity: 5 MW | 1 MW · Mobilisation in 5 days | for verified buyers |
| Plant capacity10 MWHOY-8F8-02 | Plant capacity: 10 MW | 1 MW · Mobilisation in 5 days | for verified buyers |
| Plant capacity25 MWHOY-8F8-03 | Plant capacity: 25 MW | 1 MW · Mobilisation in 5 days | for verified buyers |
| Plant capacity50 MWHOY-8F8-04 | Plant capacity: 50 MW | 1 MW · Mobilisation in 5 days | for verified buyers |
| Plant capacity100 MWHOY-8F8-05 | Plant capacity: 100 MW | 1 MW · Report in 7 days | for verified buyers |
| Plant capacity250 MWHOY-8F8-06 | Plant capacity: 250 MW | 1 MW · Report in 7 days | for verified buyers |
Specifications
| Plant capacity | 5 MW to 250 MW (see variants) |
|---|---|
| Tests covered | String IV curve, insulation, earthmade to order: Transformer, switchgear, relay tests / Full plant functional and PR test |
| Instruments | Calibrated IV tracer, megger, CRM |
| Calibration | Calibration valid at test date |
| Team | Lead plus 5 member crewmade to order: Commissioning engineer plus 2 testers |
| Statutory support | CEIG inspection coordination |
| Reports | Test reports with signed formatsmade to order: Commissioning dossier with as-built |
| Duration on site | 10-14 daysmade to order: 5-7 days / 3-4 weeks |
| Performance guarantee test | Capacity and PR test per contract |
| Grid code checks | Not includedmade to order: Reactive power and ramp rate |
| Payment | Milestone on energisationmade to order: 50% on start, 50% on report |