Catalogue / Resource assessment (solar, wind, hydro)
Solar resource assessment with ground measurement, Core seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core service of solar resource assessment with ground measurement by Hoysala covers 4 measurement duration options (3 months to 18 months). Design: extreme wind and wake studies, turbine and module selection input and loss factors for local conditions. Typically used for hybrid project planners, state agencies mapping resource and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-0E1 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Campaign 3-24 months
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration3 monthsHOY-0E1-01 | Measurement duration: 3 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration6 monthsHOY-0E1-02 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration12 monthsHOY-0E1-03 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration18 monthsHOY-0E1-04 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | 3 months to 18 months (see variants) |
|---|---|
| Technology | Solar GHI/DNI |
| Data source | Satellite and reanalysis |
| Equipment | Class A pyranometer stationmade to order: 80-120 m met mast with LiDAR |
| Uncertainty | P50/P90 with uncertainty budgetmade to order: Bankable assessment |
| Modelling | WAsP, WindPROmade to order: PVsyst, SAM |
| Deliverable | Resource reportmade to order: Hourly time series dataset |
| Calibration | Calibration pre and post campaignmade to order: Traceable calibration |
| Site count | Single site |
| Maintenance | Remote health checksmade to order: Quarterly site visit |
| Turnaround | Report within 6 weeks of datamade to order: Report in 3 weeks |