Substation and evacuation system design from Hoysala, Prime 9 series: 5 plant capacity options between 1 MW and 50 MW. Design: layout optimisation for land and shading, compliant with state grid code requirements and cable sizing and voltage drop calculations. Used by IPPs and developers, captive and C&I solar owners and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-A23 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-4 weeks
- Warranty
- Design correction at no cost for 12 months
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWHOY-A23-01 | Plant capacity: 1 MW | 1 job · 3-4 weeks | on quote |
| Plant capacity5 MWHOY-A23-02 | Plant capacity: 5 MW | 1 job · 3-4 weeks | on quote |
| Plant capacity10 MWHOY-A23-03 | Plant capacity: 10 MW | 1 job · 3-4 weeks | on quote |
| Plant capacity25 MWHOY-A23-04 | Plant capacity: 25 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity50 MWHOY-A23-05 | Plant capacity: 50 MW | 1 job · 6-10 weeks | on quote |
Specifications
| Plant capacity | 1 MW to 50 MW (see variants) |
|---|---|
| Deliverables | Full IFC drawing set with calculationsmade to order: GA drawings, SLD, BoQ / Design basis report plus drawings |
| Design software | PVsyst, STAAD, ETAP, Civil 3Dmade to order: PVsyst, AutoCAD, ETAP |
| Team | Lead engineer plus 3 designers |
| Turnaround | 3-4 weeksmade to order: 6-8 weeks / 10-12 weeks |
| Revisions included | 3 rounds |
| Authority submission support | DISCOM/STU drawing approvalmade to order: CEA/CEIG drawing approval / None |
| Earthing and LA study | Optional add-onmade to order: Included |
| Format | PDF and native CADmade to order: PDF, CAD and BIM model |
| Site visit | Two visits included |
| Payment milestones | 50% advance, 50% on deliverymade to order: 30% advance, 40% on drafts, 30% on IFC |